Whiting Shoreline
Project Manager: Love, Kristen R
Introduction:
This project will investigate shore erosion problems along the Lake Michigan shore in the
vicinity of Whiting Indiana. Area under investigation for the Sec 103 study is adjacent to
the site selected for the Sec 107 project, which is a 1900-foot segment of the Lake Michigan
shoreline in Whiting, Indiana. This project is for the development of the shoreline to provide
recreational and navigation improvements. With the termination of the Sec 107 project, the Corps
will perform an initial evaluation and determine the need for a Sec 103 study.
Costs:
| Total Project Cost: |
$ TBD |
| Federal Cost: |
$ TBD |
| Non-Federal Cost: |
$ TBD |
Current Status:
The project is currently in the feasibility phase, which means that the site is
being evaluated and alternatives are being considered. This phase should be complete
by September 2006 and the final result will be a detailed project report. This
document will outline the Corps’ suggested alternatives.
|
|
|