US Army Corps of Engineers
Chicago District Website

Upper Wabash - Daily Lake Report

19 April 2021

Basin Project Winter Pool (feet) Summer Pool (feet) Flood Pool (feet) Today's Pool (feet) Deviation from Pool (feet) 24-hr Change (feet) 24-hr Precip (inches) 6am Outflow (cfs) Percent Utilization
Upper Wabash Roush 737 749 798 740.62  N/A + 0.77 0.00 21 0.0
  Salamonie 730 755 793 741.73 N/A + 0.31

0.00

27 0.0
  Mississinewa 712 737 779 722.73 N/A + 0.31

0.00

37 0.0